Baramati Industrial Area Water Supply Scheme, Providing, Laying & Jointing of 711 mm dia. M. S. RWRM in place of rusted 900 mm dia. existing RWRM from Ch. 00 to 11210.00 m
NAME OF DIVISION
LOCATION
MIDC had provided 900 mm dia. M.S raw water pipeline of length 24.40 km for water supply to the Baramati industrial Area. The said line was laid from Jack well at Kumbhargaon to Baramati Industrial Area. Out of this total length, approximately 12 km of the pipeline was corroded and, hence, required to be replaced. The scope of work included necessary excavation for the pipeline, construction of “H” type R.C.C. chairs, supply of 711 mm dia (O.D.) 8 mm thick spiral welded M.S. pipes and providing & fixing of A.V, S.V., expansion joint, reflux valve, encasing for the pipeline in underground portion, painting of pipeline, thrust block, fixity block, construction of break pressure tank, etc. The work also consisted of providing, laying & jointing 1000 mm dia RCC NP-3 class pipes for crossing Baramati-Bhigwan road.
MIDC had provided 900 mm dia. M.S raw water pipeline of length 24.40 km for water supply to the Baramati industrial Area. The said line was laid from Jack well at Kumbhargaon to Baramati Industrial Area. Out of this total length, approximately 12 km of the pipeline was corroded and, hence, required to be replaced. The scope of work included necessary excavation for the pipeline, construction of “H” type R.C.C. chairs, supply of 711 mm dia (O.D.) 8 mm thick spiral welded M.S. pipes and providing & fixing of A.V, S.V., expansion joint, reflux valve, encasing for the pipeline in underground portion, painting of pipeline, thrust block, fixity block, construction of break pressure tank, etc. The work also consisted of providing, laying & jointing 1000 mm dia RCC NP-3 class pipes for crossing Baramati-Bhigwan road.
Services Provided
Duration