MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

Chakan Industrial Area Permanent Water Supply

DG - CHAKAN (II) INDUSTRIAL AREA…Chakan Industrial Area Ph-I, II, III, IV, and Talegoan II. Permanent Water Supply Scheme Construction of 12,500 Cum capacity Sump, 1000 Cum capacity ESR and allied work.

NAME OF DIVISION

Project Division, Chinchwad – Pune

LOCATION

Chakan – Maharashtra
background-image background-image background-image

MIDC is developing 1524 Hectare of land as Chakan Industrial area Ph-II. Similarly, MIDC has developed Chakan Industrial Area Phase I, Phase III, and Phase IV. It is proposed to supply water to these areas from the 80 MLD WTP at Talegaon Indl Area (Ph-I). After fulfilling the water demand of these areas, the remaining water is proposed to supply to existing Talawade IT Park and Pimpri–Chinchwad Industrial area. Accordingly, it is proposed to construct 12,500 cum capacity RCC sump and 1000 cum capacity RCC ESR in Chakan Industrial Area Phase-II, including the construction of the compound wall, internal road, and watch cabin.

Project Scope

background-image

MIDC is developing 1524 Hectare of land as Chakan Industrial area Ph-II. Similarly, MIDC has developed Chakan Industrial Area Phase I, Phase III, and Phase IV. It is proposed to supply water to these areas from the 80 MLD WTP at Talegaon Indl Area (Ph-I). After fulfilling the water demand of these areas, the remaining water is proposed to supply to existing Talawade IT Park and Pimpri–Chinchwad Industrial area. Accordingly, it is proposed to construct 12,500 cum capacity RCC sump and 1000 cum capacity RCC ESR in Chakan Industrial Area Phase-II, including the construction of the compound wall, internal road, and watch cabin.

Services Provided

  • Design, Construction & Commissioning of RCC Sump along with Pump House.
  • Design, Construction & Commissioning of ESR.
  • Inlet & Outlet Pipeline work.
  • Construction of UCR Compound wall & Approach Road.
  • Water Resistant Epoxy Paint treatment.
  • Construction of Watchman Cabin.

Duration

April 2017 – Work in progress.