Construction of 9000 cum Additional pure water sump in WTP premises.
NAME OF DIVISION
LOCATION
MIDC had constructed 72 MLD water supply scheme from Jayakwadi Backwater. The water treatment plant was constructed in the industrial area. Water required for industrial use was being supplied to various areas through a 9000 m3 capacity of Sump. As the water supply scheme was being augmented to 72 MLD capacity, it was proposed to construct an additional pure water sump of 9000 cum capacity along with pump house.
MIDC had constructed 72 MLD water supply scheme from Jayakwadi Backwater. The water treatment plant was constructed in the industrial area. Water required for industrial use was being supplied to various areas through a 9000 m3 capacity of Sump. As the water supply scheme was being augmented to 72 MLD capacity, it was proposed to construct an additional pure water sump of 9000 cum capacity along with pump house.
Services Provided
Duration